Quarterly Engineering Project:
The Pond Water Challenge
DUE DATE:
Individual Projects: FRIDAY, September 26th, 2014, 3PM
1. You must obtain a pond water sample AND provide evidence that you, personally, collected it.
2. You must describe your experience, including photographs and illustrations, in a 3 to 5-slide presentation.
3. Your container must have a tight-fitting lid, and should be plastic, not glass. Your sample should be at least 250ml in size.
4. You must practice safety. Any water collected from the Salinas River, or any other flowing waterway, including the Pacific Ocean, will not be accepted.
2. You must describe your experience, including photographs and illustrations, in a 3 to 5-slide presentation.
3. Your container must have a tight-fitting lid, and should be plastic, not glass. Your sample should be at least 250ml in size.
4. You must practice safety. Any water collected from the Salinas River, or any other flowing waterway, including the Pacific Ocean, will not be accepted.